Status changed: Pending to Draft.
Base trim 1st floor and 2nd floor.
1st Floor Green and blue bedrooms- corner repairs.
2nd Floor yellow bedroom- corner by window on the right.
Crack in 2nd floor molding and stairs.
3rd Floor Hall windows- white paint.
Repair glue stains on 3rd floor wall adjacent to windows on right and paint wall corner to corner.
3rd Floor blue bedroom- small closet by window- corner with crack retape.
Front door fix/paint under beam over columns and below front door.
2nd Floor screen in porch- repair/touch up paint trim below all doors as needed.
Touch ups only.
Includes caulk, putty, and sand as needed.
Match colors or homeowner has paint.
If touch ups do not match, corner to corner will be needed and price will be adjusted.