Status changed: Pending to Draft.
Includes hallway, laundry, and bedroom.
Hang ceiling and finish to paint ready only.
1/2 4×8 sheets glue and screw application.
Includes tape, block, skim, and sand.
Bedroom hang over existing ceiling.
Does not include closets.
Ceiling to wall to be caulked- do not mud texture wall.
Total cost includes labor and high-quality materials.